<?xml version="1.0" encoding="UTF-8"?>
<item xmlns="http://omeka.org/schemas/omeka-xml/v5" itemId="6200" public="1" featured="0" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://omeka.org/schemas/omeka-xml/v5 http://omeka.org/schemas/omeka-xml/v5/omeka-xml-5-0.xsd" uri="https://declassified.library.utoronto.ca/items/show/6200?output=omeka-xml" accessDate="2026-08-16T04:53:33-04:00">
  <fileContainer>
    <file fileId="4113">
      <src>https://declassified.library.utoronto.ca/files/original/d101961f65748af9a0de3b73a6e57f3d.pdf</src>
      <authentication>d6a0f282aff72a3fc2fdfa5b4b161070</authentication>
      <elementSetContainer>
        <elementSet elementSetId="31">
          <name>PDF Text</name>
          <description/>
          <elementContainer>
            <element elementId="131">
              <name>Text</name>
              <description/>
              <elementTextContainer>
                <elementText elementTextId="44337">
                  <text>Document disclosed imHor tfrg firrfcc fo Information Art
Document divulgue en veijtu de la Loi sur Tacces a Tinformation

or

DEPARTMENT OF EXTERNAL AFFAIRS'

/,

Subject.
Date

June... 2.6/6?.

MIRV WARHEADS
187-Million Contract for 68
Minuteman Vehicles Is Let
Without Public Notice
By JOHN W. FINNEY
.*. .Special to The New York Times

, WASHINGTON, June 26 —
^Without any public announcement the Air Force last week
ordered the controversial multiple warheads for its Minuteman 3 intercontinental missiles
The Air Force awarded an
$87-million contract to the
General Electric Company for
production of 68 missile re-entry
vehicles, known as MIRV's, for
, multiple independently target'able re-entry vehicles. It will be
the fir-st production run in an
•Air Force plan to equip 500
Minuteman 3 missiles with multiple warheads.
The contract was awarded
last Thursday, the same day
that President Nixon told a
news conference that the Administration was considering
the posibility of a moratorium
yen MIRV testing as part of an
arms control agreement with
the Soviet Union.
Not Easily Controlled
To opponents of an American1
antiballistic, missile system,
^however, the clear implication
of the production contract was
that the situation was passing
(beyond the point where deployment of the multiple warheads could be readily controlled by a moratorium on
testing.
The award of the contract
was disclosed today by Representative William S. Moorhead,
Democrat of Pennsylvania, who
accused the Pentagon of "will-]
jful concealment" about a "crucial development that could es!

IARMS CONTP.CLI
I ANB QISAPM. |

Continued on Page 10, Column 7

Publication

;calate the arms race and endanger hopes for serious arms
limitation talks with the Soviet Union."
The contract, he noted, was
awarded at the very time that
41 Senators were introducing a
resolution calling upon the Administration to enter into a
mutual moratorium with the
Soviet Union on the testing of
MIRV warheads. At his news
Iconference last week, ' President Nixon described lie resolution, sponsored by Senator
Edward W. Brooke, Republican
of Massachusetts, as "a very
constructive proposal."
But the President clearly sug
gested that any such morato
rium must await the. strategic
arms talks,- which are now
likely to begin in August. But
by that time, Mr. Moorhead
noted at a news conference, the
United States will already be
producing multiple warheads
to be placed on operational
missiles some time in 1970.
Sees Soviet Reaction
Calling for an immediate halt
to the contract Representative
Moorhead said:
"The critical issue here is the
fact that the Soviet Union,
when it hears of this production contract, will naturally feel
that our testing has been successful and we are sufficiently
[confident of the accuracy and
! reliability of the MIRV to enter
into a contract to produce it.
"Conservative Soviet military
planners then will be forced to
counter this multiplication of
our offensive nuclear capability
with added defensive and offensive forces of their own,
and a new' round of the arms
race, will be on."
Mr. Moorhead acknowledged
'that the Air Force had Concessional authority to proceed
;wito the production contract.
Produotion money was included In the defense appropriations bill passed last year
under a line item, reading:
"Missile procurement — Air
Force."
But one of Representative
Moorhead's complaints was that
"most members of Congress,"
including some members of the
Appropriations and Armed
|Services Committees, were unaware that they were voting
jmoney for production of the
jmultiple warheads. In the "three
military budget analyses pro
vided to the House defense ap
propriations subcommittee, he
.said, the Pentagon never identified planned MIRV production.
Nor, he said, from a study of
:he hearings, the-subcommittee
•eport and the appropriations
ict was it "at all clear" that
'unds were appropriated for
&gt;roduction of the multiple waread.

The.Jew_York._T
[
Calls It 'Inexcusable'
I In light of the debate going
fcn in Congress over continuation of MIRV testing, he termed
(It "inexcusable that the Penta
gon did not adequately inform
the Congress" that it was going
to award the contract.
"On an issue of such grave
national consequence," he said
"the Pentagon owes it to the
American people to adequately
inform its elected representatives when it takes a step of
such monumental proportions."
Mr. Moorhead, a member of
a subcommittee of the Joint
Economic Committee that has
been investigating defense
spending, said he had learned
of the contract award after "we
heard a rumor and traced it
down."
According •, to information!
supplied to him by the Pentagon, an $86.8-million "letter
contract" to produce 68 Mark
12 re-entry vehicles for the
Minuteman 3 was given to Gen
eral Electric on July 10, 1968.
At that time, the Defense De
partment issued a press release
announcing on the matter.
A letter contract represents
a statement of intent, which
then has to be incorporated in
a formal contract. Under the
letter contract, G.E. was per
mitted to spend $33.9-million
to tool up its production line
and purchase long-lead time
items but not to go into actual
production.
Negotiated In Spring
The formal contract, accord
ing to information supplied to
I Mr. Moorhead, was negotiated
(in April and May and awarded
last Thursday. The granting of
the formal contract constituted,
in effect, a go-ahead for pro
duction.
• Through press releases, the
Defense Department normally
mnounces the award of major
:ontracts. The Defense Departnent public information office
iad no immediate comment on
whether it had taken any steps
to publicize the award of the
MIRV contract.
No mention of the contract
award was made in The Commerce Business Daily for the
last,fiiy.e£!ays,.a Commerce Department .publication that lists
all 'Unclassified , Government
contracts exceeding $25,000.
The Mark 12 re-entry vehicle
will contain three independently
targetable warheads, each with
the power of nearly one megaton (equivalent to one million
tons of TNT. General Electric
will be responsible primarily for
making the so-called "Bus" that
will carry the warheads and;hen release them toward their|
separate targets.
^

m

000127

�</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </file>
  </fileContainer>
  <itemType itemTypeId="1">
    <name>Text</name>
    <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
  </itemType>
  <elementSetContainer>
    <elementSet elementSetId="1">
      <name>Dublin Core</name>
      <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
      <elementContainer>
        <element elementId="43">
          <name>Identifier</name>
          <description>An unambiguous reference to the resource within a given context</description>
          <elementTextContainer>
            <elementText elementTextId="43745">
              <text>CDBM00278</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="50">
          <name>Title</name>
          <description>A name given to the resource</description>
          <elementTextContainer>
            <elementText elementTextId="43748">
              <text>Transcript from NYT</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="40">
          <name>Date</name>
          <description>A point or period of time associated with an event in the lifecycle of the resource</description>
          <elementTextContainer>
            <elementText elementTextId="43751">
              <text>6/26/1969</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="48">
          <name>Source</name>
          <description>A related resource from which the described resource is derived</description>
          <elementTextContainer>
            <elementText elementTextId="43754">
              <text>RG25-A-3-c, file 27-11-7, "DEFENCE - CONVENTIONAL AND NUCLEAR ARMAMENTS - ANTI - BALLISTIC MISSILES (ABM) = DEFENSE - ARMEMENTS DE TYPE CLASSIQUE ET NUCLEAIRE - ENGINS ANTIMISSILES (ABM)," vol. 10357, part 6, Library and Archives Canada, (LAC).</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="39">
          <name>Creator</name>
          <description>An entity primarily responsible for making the resource</description>
          <elementTextContainer>
            <elementText elementTextId="43757">
              <text>External Affairs</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="47">
          <name>Rights</name>
          <description>Information about rights held in and over the resource</description>
          <elementTextContainer>
            <elementText elementTextId="43760">
              <text>Canadian Crown</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="49">
          <name>Subject</name>
          <description>The topic of the resource</description>
          <elementTextContainer>
            <elementText elementTextId="43763">
              <text>Anti-ballistic missiles</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="41">
          <name>Description</name>
          <description>An account of the resource</description>
          <elementTextContainer>
            <elementText elementTextId="43766">
              <text>Air Force Orders MIRV Warheads</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="45">
          <name>Publisher</name>
          <description>An entity responsible for making the resource available</description>
          <elementTextContainer>
            <elementText elementTextId="43769">
              <text>Canada Declassified</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="51">
          <name>Type</name>
          <description>The nature or genre of the resource</description>
          <elementTextContainer>
            <elementText elementTextId="43772">
              <text>Text</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="42">
          <name>Format</name>
          <description>The file format, physical medium, or dimensions of the resource</description>
          <elementTextContainer>
            <elementText elementTextId="43775">
              <text>PDF</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="44">
          <name>Language</name>
          <description>A language of the resource</description>
          <elementTextContainer>
            <elementText elementTextId="43778">
              <text>en</text>
            </elementText>
          </elementTextContainer>
        </element>
      </elementContainer>
    </elementSet>
  </elementSetContainer>
</item>
